New Pool Construction

Custom pools, built to one standard.

A new Next Level pool is a single line item on the bid — but it's seven trades, eight inspections, and twelve weeks of work in the ground. Below: the quality standards we hold across every project, three project levels, finish options, and a week-by-week build calendar.

Quality Standards

What we hold ourselves to, on every project.

The substance of a Next Level pool lives in four places — the materials, the equipment, the structural engineering, and the people running the project. Here's what's true on every job, regardless of project level.

01 · Materials

Premium specified, not "builder-grade by default."

Every material on every project is chosen on purpose — not pulled from a default builder spec sheet because no one asked.

  • Glass or porcelain waterline tile
  • Travertine, natural stone, or premium pavers
  • Diamond-brite, polished, or pebble finishes
  • Coping in matched or contrasting material
02 · Equipment

Sized for actual Florida run-hours.

Equipment is specced for how the pool will actually be used in the Central Florida climate — not from a generic worksheet.

  • Variable-speed pumps, properly sized
  • Salt, chlorine, or hybrid sanitation
  • Heat pump or gas heater per use case
  • Full automation with smartphone control
03 · Engineering

Engineered shell, full inspections.

The structural shell is what every other layer sits on for the next 30+ years. We don't shortcut steel, gunite, or inspection sign-offs.

  • Engineered rebar grid to spec
  • Pneumatically-shot gunite shell
  • Inspection sign-off at every stage
  • Lifetime structural warranty
04 · Project oversight

Owner on every job, single point of contact.

The person who designs your pool is the same person on the job for every structural stage. No sales handoff, no foreman you've never met.

  • Robbie on-site for every structural stage
  • Single point of contact, start to finish
  • Written scope against a scaled drawing
  • 30-day post-startup follow-up
Three Project Levels

Same standards, three scopes.

Most projects sort cleanly into one of three levels — based on how much custom work, water feature, and finish detail goes into the build. The standard of execution is identical across all three.

01 · Essential

A clean, well-built pool.

A complete custom pool with our standard finish, deck, and equipment package. Where most starter projects land.

  • Engineered gunite shell + lifetime structural warranty
  • Standard plaster finish
  • Glass waterline tile from in-stock range
  • Travertine paver deck around perimeter
  • Variable-speed pump + cartridge filter
  • 2 LED lights, salt or chlorine sanitation
03 · Signature

Architecturally specific.

Fully custom — raised structural elements, sheet waterfalls, in-water loungers, and an architectural lighting plan. Designed around the home.

  • Everything in Premium, plus:
  • Pebble aggregate or fully custom finish
  • Raised attached spa with tiled vertical face
  • Sheet waterfall feature wall
  • In-water loungers, sun shelf, in-deck loungers
  • Architectural lighting plan (8+ fixtures)
Why no prices here

Every backyard, lot, and design brief is different — and we'd rather give you an honest, specific number for your project than an anchored range that might mislead. After a free on-site visit, you get a written scope with line-item pricing.

Request a Quote
The Finish

What the water actually touches.

The finish — the inside surface — is the single biggest aesthetic decision and the biggest driver of long-term feel and maintenance. Three families, very different vibes.

Standard tier

Diamond-brite

White marble dust + cement. Reads bright Caribbean blue underwater. Smoothest underfoot, lowest cost, shortest lifespan. The default for most "standard" builds — for good reason.

Lifespan
7–10 years
Underfoot
Smooth
Maintenance
Standard
Look
Bright blue

Swatch is representative — exact tone varies by light and depth.

Premium tier

Polished aggregate

Smaller marble or quartz aggregate, mechanically polished after cure. Rich saturated blues, glassier feel, longer lifespan. The middle of the road in cost, the top of the road in finish quality.

Lifespan
15–20 years
Underfoot
Glassy smooth
Maintenance
Lower
Look
Deep saturated

Swatch is representative — exact tone varies by light and depth.

Signature tier

Pebble aggregate

Larger natural pebble exposed on the surface. Most natural, most varied color (greys, greens, slates), longest-lived. Slightly textured underfoot — some love it, some don't. We'll show you in person.

Lifespan
20+ years
Underfoot
Textured
Maintenance
Lowest
Look
Natural, lake-like

Swatch is representative — exact tone varies by light and depth.

The Calendar

Twelve weeks, one trade at a time.

A typical Next Level new build runs 10–16 weeks of active work after permits issue. Here's what each week actually looks like — and why it can't be compressed without quality loss.

Wk 01

Layout & excavation

String the shape on the ground, dig to spec, haul off spoils.

Wk 02

Steel & plumbing

Rebar grid tied. Returns + bottom drain plumbed and pressure-tested.

Wk 03

Gunite shell

Concrete shot pneumatically. Then it cures — slowly, on purpose.

Wk 04–05

Cure

The shell hardens. We're not idle — tile and coping are being staged.

Wk 06

Tile & coping

Waterline tile and coping installed. Equipment pad rough-set.

Wk 07–08

Deck

Pavers, travertine, or stone. Slowest visible week — worth the patience.

Wk 09–10

Plaster

Final finish goes on. Filled with water immediately. Chemistry begins day one.

Wk 11–12

Startup & handoff

Equipment commissioning, automation setup, owner walkthrough. First swim.

Specific to New Builds

Things people ask before signing.

For broader questions about renovations, spa work, and reshaping, see the renovations page. These are the new-build-specific ones.

  1. Q.01

    How fast can you actually start a new build?

    Once you've signed and we've submitted permits, expect 3–6 weeks before excavation depending on the county. Orange and Seminole are typically faster than Lake or Volusia. We can usually break ground 5–8 weeks after the contract date.

  2. Q.02

    Will you work with my HOA?

    Yes — and we prep submittal packets specifically for HOA review. Scaled drawings, elevations, finish specs, deck materials. Most HOAs approve our packets without revisions; the few that come back, we revise and resubmit on our end.

  3. Q.03

    Do you build under screen enclosures, or do you build first and add screen later?

    Both — but coordinated. If you want a screen enclosure, we plan the deck footprint, footings, and tie-in points up front so the screen contractor can come in cleanly after the deck cures. We'll recommend a screen contractor we've worked with before.

  4. Q.04

    What does the lot need to look like before you can dig?

    Clear access for an excavator (typically 8 feet wide minimum), no irrigation in the dig zone, marked utility locates, and a place to stage spoils on-site or a dump truck route off-site. We do a pre-dig walk to confirm all of that.

  5. Q.05

    Why does it cost what it costs?

    About 40% of a typical new build is materials (gunite, plaster, deck, equipment). About 35% is skilled labor across seven trades. About 15% is permits, engineering, inspections, and overhead. About 10% is project margin. Every estimate breaks this down on request.

  6. Q.06

    What's the warranty, in plain terms?

    Lifetime structural warranty on the shell — for as long as you own the home. Plaster carries 1–10 years depending on the finish you pick. Equipment carries manufacturer warranties (typically 1–3 years) and we handle warranty claims on your behalf. Tile and coping: 1 year on workmanship.

Start a New Build

Tell us about the lot.

The first step is a free on-site visit with Robbie. We'll walk the property, talk through how you want to use the backyard, and follow up with a scaled drawing and written scope.

Request a Quote

Start with a free on-site visit.

Replies in < 1 business day
  1. 1Project
  2. 2Timeline
  3. 3Details
  4. 4Contact

What kind of project?

Pick the one that best fits — you can still add detail later.

Project type